wp77c9f856_0f.jpg
wp5e60998d.png
wpcdfa0ad0.png
wp3891f24c.png
wpa5d71f72.png
wpeede347e.png
wp6b172a35.png

QROS has been involved in a number of high profile projects the most prominent being the 2012 Olympics site in Stratford East London. QROS had a permanent team at the Olympic Enabling project for a period of over 15 months and were instrumental in bringing in the project 3 months ahead of schedule. On-site screening was conducted for hydrocarbons, heavy metals, phenols, ammonium, cyanide, pH and chlorinated solvents on a routine basis with over 20,000 samples analysed at a rate of over 80 samples as day.

 

            “on-site lab helps high tech Olympic park clean up”

 

QROS is also responsible for the on-site screening for the West Ham Flood Alleviation Scheme at Stratford, London and for some aspects of the Cross Rail Project at Kings Cross, London.

wpf4fe3a1d.png

A Selection of Clients

QROS has built up in a very short time a comprehensive list of clients and are proud to say that each one has given us repeat business. The list  includes;

 

ABB

AECOM

ARUP

Briggs Marine

Campbell Reith

Carillion Plc

Carnell

CH2M Hill

Cheetam Hill Construction

Corus

Costain

Eastwood & Partners

Enviros

ESGL

Expanded Structures Limited

Galliford Try

GeoEnvironmental

GeoTechnics

Golder Associates

Halcrow

HJB

IHBrown

IKM

K-Land

Laing 0’Rourke

Lancsville Construction Ltd

Land & Water

Mace Plus

McAlpine

Micholsons

MWH

Nuttall

O’Keefe

OHES

REC

SWalsh

Tamdown

Terra Vac

Toureen Mangan

URS

VHE

White Young & Green

Wimpey Homes

 

wpeebbe587_0f.jpg

Olympic site Stratford aerial 16th July 2009.